Zj20/1350 Truck-Mounted Water Well Drilling Rig/Truck-Mounted Workover Rig/Oilfield Drilling Rig Video,Demo, How It Works & Features

2025-04-09 2580

Product Specifications

ZJ20/1350
Online Service Support
One Year
New
AC Motor
800 Meters
Rotary
High Efficiency
Drilling Milling Machining
Energy & Mining
0.25~1.4m/S (0.82~4.6FT/S)
1,580kn(355,200lbf)
3,000m (9,840FT, 4-1/2'' Dp)
55000 Kg
Engine, Bearing, Gearbox, Motor, Gear, Pump
Provided
280kn (62300lbf)
45km/H (28mph)
55,000kg (121,250lb)
1,700kn(382,000lbf )
8,000m (26,200FT, 2-7/8'' Dp)
19.9X3.1X4.37m(65.3X10.2X14.3FT)
Wood Box
standard
Cn
84139100
Dislike 0 Comment 0
More>Recommended Video
Fbu Flush by Unit Xj150/250/350/450/550 Flushing Well Workover Rig

257

Coiled Tubing, API 5st for Coiled Tubing Unit

273

Twin Soft Seal Flange Lubricated Gate Valves for Sale

496

Nov Varco TDS 11 Top Drive System and Parts

382

Reduction Planetary Spiral Bevel Gear Oil Rotary Table for Drilling Rig

421

Zj40 Oil Drilling Rig 4000m Land Drilling Rig and Xj850HP Workover Rig Truck Mounted Drilling Rig with Mud Tank Circulation System Zyt Petroleum Equipment

502

API Truck Mounted Drilling Hydraulic Oil Drill Well No-Guyline Workover Rig

239

Xj850HP/Zj40/4000m Land Oil Drilling and Workover Rig 225t Drilling Rig with Mud Tank Circulation System Zyt Petroleum Equipment

493

Pulling Unit Mobile Lifting Unit Xj350 Workover Rig for Workover and Well Service60t 80t 90t Self Propelled Truck Mounted Drilling Rig Oil Rig

441

Multifunctional Well Flushing Sand Washing Workover Rig Rapid Service Flushby Unit

433

Mobile Workover Rigs Built for Oil and Gas Field Efficiency

422