$13000.00
1 Set (MOQ)
Biscuit Machine Worked by Tray for Biscuit Factory
Shanghai Jimei Industry Co., Ltd.
Swipe or use the arrows to view product images.
1000L 2000L 3000L 5000L Beer Making Machine Beer Brewery Machine
| Price | $110000.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 413 people viewed |
Model NO.:
MT-1000L, 2000L, 3000L, 5000L
After-sales Service:
5 Years
Warranty:
3 Years for Tank
Processing Material:
Water,Malt,Hops,Yeast
Application:
Beer
Customized:
Customized
Certification:
CE, ISO9001, TUV
Power Source:
Electric Steam,Gas,Direct Fire
Automatic Grade:
Semi-Automatic
Material:
SUS304 Stainless Steel
Material Thickness:
Inner:3-4mm, Exteior:2mm
Voltage:
220V/380V
Dimension(L*W*H):
Depending on Capacity
Weight:
Depending on Capacity
Welding:
Arc Argon Protection
Electric Elements:
up to CE UL Standard
Brewhouse Heating:
Steam Jacket , Electric Tub
Fermenter:
Double Wallet with Dimple Cooling
Cooling Unit:
Chiller with Glycol Tank
Control Unit:
Temp. Controller, HMI , PLC or Touching Screen
Technolgy:
Offer Auto CAD and 3D Design Drawing
After-Service:
Installation and Equipment Commission
Trademark:
METO
Transport Package:
Plastic Film, Plywood Case; Container;
Specification:
Customized
Origin:
Jinan, China
HS Code:
84384000
Product Description
METO Craft Beer Equipment is a professional manufacturer of craft beer equipment. Our company
has integrated design, research, development, production, sales, installation, commissioning, and after
-sales service, is committed to become the world first-class craft beer equipment supplier.
1000L 2000L 3000L 5000L Beer Making Machine Beer Brewery Machine
| Brewing System | Components | Capacity | Specification |
| Grinding System | Miller | 500KG/H | Double Roller,Noise<60db |
| Brewhouse System | Mash/Lauter tun | 2000L | Mashing Process:Decoction.Infusion.Multi-step infusion Interior:2.5-3mm Exteior:3-4mm |
| Brew Kettle/ Whirlpool Tank | 2000L | ||
| Fermentation System | Fermentation Tank | 2000L/4000L | Top manway/Side manway Drying hop port to brew IPA Dimple Plate Cooling jacket Carbonation port to fill CO2 |
| Cooling System | Glycol Water tank | 4000l | Equiped with PU level indicator |
| Cooling machinery | 7P*2 | ||
| Cleaning System | Disinfection Tank | 150L | SUS304 full welded |
| Alkali Tank | 150L | ||
| Pump | 3T/h | ||
| Control System | Control Cabinet | Manual/PLC/ HMI | Manual/Semi-automatic/Automatic |
| Optional | Auger System | ||
| Grain Case | |||
| Grist Hydrator | |||
| Piping flow panel for Brewhouse | |||
| Brewhouse Separate PLC Controller | |||
| Customized | |||
Packaging Details
1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.
1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;
2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and
locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is
free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended
installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method
available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should
be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.
2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and
locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is
free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended
installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method
available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should
be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.
METO is a professional manufacturer of beer brewing equipment. We mainly have the following kinds of
equipment: including 100L, 200L, 300L, 500L, 1000L, 2000L etc. We can produce the equipment according
to our clients' requirements.
1. What Certificate do you have for your beer brewing equipment?
We can offer CE, PED, UL certificate.
2. Mashing system can be controlled automatically?
Yes. You can input your recipe into the control cabinet, then it can be finished automatically.
3. Your brewery equipment has hops back?
Yes, we install hops back for all our brewery equipment.
4. What is pressure of fermentation tank?
0.15Mpa for fermentation, 0.3Mpa at most---------
5. What is delivery time?
40 working days.
6. Can I visit your factory?
Yes, you are warmly welcome to visit us at any time. We will treat you with our beer.
- Similar Products
$23000.00
1 Set (MOQ)
Automatic Ultrasonic Cutting Machine for Cake
Shanghai Jimei Industry Co., Ltd.
$280000.00
1 Piece (MOQ)
Organic Brown Sugar Making Machine for India Factory
Shanghai Genyond Technology Co., Ltd.