Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

White Interior Paint Concrete Wall Acrylic Polyurethane Topcoat/Smooth Film/Water Resistance

Price $3.49
Min Order 5000 kg
Availability In Stock
Shipping From Shandong, China
Popularity 274 people viewed
Model NO.:
Acrylic Polyurethane-white. in. 2
Color:
White
Appearance:
Liquid
Main Raw Material:
Acrylic
Method:
Spray/Roll/Brush
Level:
Finish Coat
Drying Method:
Air Drying
Certification:
ISO9001, ISO9000
Substrate:
Steel
Components:
Resin + Pigment + Solvent + Additive
Formation Mechanism:
Conversion Type
Mixed Weight Ratio:
a:B=5:1
Shelf Life:
1year
Applicable Period:
23ºC, 4h
Matching Paint:
Two-Component Epoxy Paint
Viscosity (Coating -4):
≥60s
Fineness:
≤35μm
Nonvolatile Fraction:
≥60%
Application Property:
No Abnormalities
Surface Drying:
1h
Actual Drying:
24h
Cross-Cut Test:
Level 2 Pass
Pencil Hardness:
Level Hb Pass
Trademark:
Ayrood
Transport Package:
Iron Drum
Specification:
Main Paint 20KG + Curing Agent 4KG
Origin:
Jining, Shandong, China
Product Description
White Interior Paint Concrete Wall Acrylic Polyurethane Topcoat
/Smooth Film/Water Resistance
 
We use paint packaging cans imported from Germany, transport will be free for you to strengthen the packaging, to ensure that the product is transported to your hands is the most perfect state, and our packaging design is exquisite, excellent workmanship, the quality of the product itself is excellent, so the products are exported to dozens of countries and regions.
 
Design Usage

1. Interior steel component;
2. Interior steel products;
3. Indoor instrumentation and other workpieces, etc.

Design Feature

1. Air drying;
2. Uniform and beautiful color;
3. Strong adhesion;
4. Good resistance to water and oil;
5. Excellent physical and chemical properties.

Executive Standard

A variety of regular colors, but not white.

Execution Conditions

· Surface Treatment
 
1. Steel sandblasting to Sa2.5 level, or manual rust removal St3 level, rough surface 40-70μm, keep the substrate surface clean and dry.
  2. After reaching the above rust removal standards, the primer coating should be completed within 4h. Surfaces that fail to be primed in time should be resurfaced.


· Humidity & Temperature
 
The substrate temperature is 0 to 50 ° C, and must be 3 ° C above the dew point, and the relative humidity is not greater than 85%.

Safety Matters

1. Proper ventilation of the construction site;
2. Fireworks are strictly prohibited in the construction site and adjacent areas;
3. Use explosion-proof electrical equipment;
4. Metal impact is strictly prohibited;
5. Prevent static accumulation;
6. Wear necessary protective equipment;
7. Avoid inhaling paint mist, avoid skin contact with paint and thinner, etc;
8. If the eyes are accidentally splashed with paint, wash with plenty of water and seek medical attention;
9. Properly dispose of empty paint drums and remaining paint to avoid environmental pollution;
10. Take all other necessary safety and fire control measures according to the specific situation on the scene.

Company Profile

Packaging & Shipping

Certifications

  • Similar Products
Full Page Contact Supplier