$37700.00
1 Piece (MOQ)
DTH Drilling Rig Track Wagon Drill for Blasting
Sinoway Industrial (Shanghai) Co., Ltd.
Swipe or use the arrows to view product images.
Complete Set of Intelligent Equipment for Underground Mining Cutting Tunnel Jumbo
| Price | $99999999.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Hunan, China |
| Popularity | 488 people viewed |
Model NO.:
CY-T313C
After-sales Service:
24 Hours on Online and Replay
Warranty:
1000hours and 1 Year Whichever Comes First
Certification:
ISO 9001:2000, ISO 9001:2008
Condition:
New
Motor:
AC Motor
Drill Hole Diameter:
150-200mm
Drill Hole Depth:
6.3m
Bit Type:
Drag Bit
Drilling Way:
Rotary
Voltage:
1000V
Trademark:
Chuangyuan
Transport Package:
15697mm*2200mm*3500mm
Specification:
15697mm*3134mm*4400mm
Origin:
China
Product Description
The cutting tunnel jumbo adopts a three-arm combination design with dual tunneling arms and a cutting arm. It enables simultaneous cutting and tunneling operations, completing blasting and cutting holes simultaneously. This design saves more than 20% of rock drilling time, with tunneling blast holes reaching a depth of 6m and cutting holes reaching 6.3m in one operation. It achieves single drifting footage of over 5.5m per cycle.
Deep single rock drilling depth
Using a composite extended propeller design, the depth of rock drilling blast holes can reach up to 6m.
Cutting and rock drilling coordinated operation
Three-arm independent control, cutting and tunneling synchronized cooperation.
Wide operating range
Designed with dual propellers, it achieves broad coverage of rock drilling section.
| Deep single rock drilling depth Using a composite extended propeller design, the depth of rock drilling blast holes can reach up to 6m. Cutting and rock drilling coordinated operation Three-arm independent control, cutting and tunneling synchronized cooperation. | Wide operating range Designed with dual propellers, it achieves broad coverage of rock drilling section. |
| A(mm) | B(mm) | C(mm) | D(°) | E(°) | F(mm) | G(mm) | H(mm) | I(mm) |
| 15697 | 3810 | 442 | 16 | 16 | 2600 | 3500 | 900 | 2200 |
| J(mm) | K(mm) | L(mm) | M(°) | N(°) | P(mm) | Q(mm) | S(mm) | T(mm) |
| 500 | 3134 | 8500 | 4000 | 40 | 10000 | 7800 | 4200 | 3500 |
| Item | Unit | Value | ||
| Cutting | Tunneling (composite beam) | |||
| Parameters of rock drill | Shank | / | T60 | R38/T38 |
| Hole diameter | mm | 127~180 | 38~64 | |
| Maximum impact power | kW | 35 | 18 | |
| Maximum turning torque | N.m | 2285 | 1050 | |
| Propelling beam parameters | Total length | mm | 5310 | 4910 |
| Drilling depth | mm | 6300 | 6000 | |
| Feed force | kN | 20 | 15 | |
| Tunneling drill arm parameters | Propeller compensation | mm | 1800 | |
| Rotation of propelling beam | ° | 360 | ||
| Arm pitch | ° | -25/55 | ||
| Walking parameters | Diesel engine power | kW | 96 | |
| Departure angle | ° | 16 | ||
| Approach angle | ° | 16 | ||
| Grade ability | ° | 14 | ||
| Walking speed | km/h | 3.7 | ||
| Electrical system | Main engine power | kW | 55/75 | |
| Voltage | V | 1000 | ||
| Frequency | Hz | 50 | ||
| Hydraulic system | Maximum system pressure | bar | 250 | |
| Hydraulic oil tank volume | L | 480 | ||
| Filtration accuracy | μm | 10 | ||
| Water supply system | Motor power | kW | 7.5 | |
| Maximum flow rate | L/min | 400 | ||
| Gas supply type | Rated power | kW | 11 | |
| Maximum flow rate | L/min | 1970 | ||
- Similar Products
$67000.00
1 Piece (MOQ)
Ks680 Top Hammer Drilling Rig
Zhejiang Koonsa Heavy Industry Machinery Co., Ltd.
$21102.00
1 Set (MOQ)
Zdy1300 Explosion-Proof Drilling Rig
CCTEG Xi'an Research Institute (Group) Co.,Ltd